Derecktor Dania extends lift piers, increases lifting capacity to 220 LOA
The lift pier extension project, engineered by Cummins Cederberg in Miami, will allow Derecktor Dania to fully utilize the lifting capacity of the existing hoist and permit vessels up to 220 feet length overall (LOA).