
2020 in review: Letter from our Principals
A historic and challenging year is drawing to a close and while we look forward to 2021 and plan for the future, we also want to take the time to highlight the positives of 2020.
A historic and challenging year is drawing to a close and while we look forward to 2021 and plan for the future, we also want to take the time to highlight the positives of 2020.
Construction is underway on the repairs to the eminent Dinner Key Marina. Fronting Biscayne Bay in historic Coconut Grove, the Dinner Key Marina is one of the largest wet slip marinas in Florida, as well as the eastern U.S.
With proper planning, routine inspections, proactive maintenance, and thoughtful design, a seawall owner can maintain shoreline stabilization and protection for their property now and into the future.
The lift pier extension project, engineered by Cummins Cederberg in Miami, will allow Derecktor Dania to fully utilize the lifting capacity of the existing hoist and permit vessels up to 220 feet length overall (LOA).
Cummins Cederberg is expanding and proud to announce our newest office in Tallahassee, Florida.