2020 in review: Letter from our Principals
A historic and challenging year is drawing to a close and while we look forward to 2021 and plan for the future, we also want to take the time to highlight the positives of 2020.
A historic and challenging year is drawing to a close and while we look forward to 2021 and plan for the future, we also want to take the time to highlight the positives of 2020.
Brent Gore is a Senior GIS Analyst responsible for providing data management, geospatial analysis, and mapping support for various environmental and coastal development projects.
On July 27th, she successfully defended her thesis on Direct Numerical Simulation of Alongshelf Current-supported Turbidity Currents over Erodible Bed, during a Zoom presentation.
The island was once an industrial sand excavation site and is now a beautiful destination island. Cummins Cederberg led all surveying, beach design, shoreline stabilization, EIA preparation, coastal studies, and construction administration.
The latest issue of the Marina World magazine - featuring an article published by Jannek Cederberg - focuses on disaster management.
Danielle will focus on the use of coastal management tools, both new and not-so-new, to increase the resiliency of coastal shorelines.
The lift pier extension project, engineered by Cummins Cederberg in Miami, will allow Derecktor Dania to fully utilize the lifting capacity of the existing hoist and permit vessels up to 220 feet length overall (LOA).
Cummins Cederberg is expanding and proud to announce our newest office in Tallahassee, Florida.